![](https://static.wixstatic.com/media/347a87_855d74335c6d48029d6a4dc322f5ae75~mv2_d_4000_3000_s_4_2.jpg/v1/fill/w_1920,h_1440,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/347a87_855d74335c6d48029d6a4dc322f5ae75~mv2_d_4000_3000_s_4_2.jpg)
PROJECTS
![Firth Park.JPG](https://static.wixstatic.com/media/347a87_dca7a9a6070b40448736194617bd01b3~mv2.jpg/v1/crop/x_44,y_0,w_796,h_491/fill/w_300,h_185,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Firth%20Park_JPG.jpg)
CITY OF GOLD COAST - RECREATIONAL PARKS
Constraints Analysis
-
Review of existing flood and environmental constraints to identify design options for the implementation of recreational facilities.
-
Identify high level hydraulic impacts associate with design options.
-
Investigate opportunities to improve ecological values.
-
Identify any conflicts between the City Plan code provisions and site constraints.
![Tipplers.JPG](https://static.wixstatic.com/media/347a87_85da48139e7541de85f7bcbd610af1a9~mv2.jpg/v1/crop/x_0,y_15,w_710,h_438/fill/w_300,h_185,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Tipplers_JPG.jpg)
ECO RESORT TIPPLERS
Ecological Assessment
-
Ecological Assessment to identify existing environmental values of the site and the preparation of a professional report detailing the results of the site survey and findings.
-
Specialist advice on the layout design to protect environmental features.
-
Fauna survey.
-
Assessment of potential impacts to ecological values resulting from the proposed development.
![Swanbank.JPG](https://static.wixstatic.com/media/347a87_b74cb98c806c453ab7e2b4ab2a31d28d~mv2.jpg/v1/crop/x_219,y_0,w_790,h_487/fill/w_300,h_185,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Swanbank_JPG.jpg)
BRISWEST INDUSTRIAL SUBDIVISION
Stormwater Management, Hydraulic Assessment
-
A 62 ha industrial subdivision.
-
Undertook hydraulic modelling to size three (3) large detention basins for the mitigation of peak flow.
-
Sizing of hydraulic control structures including outlet pipes, culverts, pits and weirs.
-
Modelling analysis was based on 2D hydraulic modelling software - TUFLOW.
![Southport Mangrove.jpg](https://static.wixstatic.com/media/347a87_267d37e2336f4eaa8fff5019212f473e.jpg/v1/crop/x_0,y_27,w_670,h_419/fill/w_300,h_185,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Southport%20Mangrove.jpg)
BROADWATER PARKLANDS
Coastal Management
-
Offset marine habitat losses, associated with reclamation aspects of the project.
-
Design and construction of a 1.2 ha tidal mangrove wetland.
-
Improve the quality of stormwater discharged into the Broadwater.
-
Increased diversity of marine habitat.
-
Upgrade of the foreshore recreational parkland.
-
Design of regional boating facility.
-
Foreshore reclamation and beach nourishment.
-
Concept designs.
-
Project Coordination - Civil.
-
Environmental Offset design
![Cultural Precinct.png](https://static.wixstatic.com/media/347a87_bc226795d2cf4a498d18b1701fb21f90~mv2.png/v1/crop/x_14,y_0,w_1287,h_815/fill/w_292,h_185,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Cultural%20Precinct.png)
GOLD COAST CULTURAL PRECINCT
Ecological Assessment
-
Marine Ecological Assessment to identify existing marine habitat values of the precinct's foreshore and internal tidal lake.
-
Arborist Assessment of existing tree specimens to identify condition and health.
-
Inform master plan designs which will seek to retain areas of significant value.
-
Identify opportunities for additional habitat creation.
![Wetland.jpg](https://static.wixstatic.com/media/347a87_1fff545400454821830a107d2bb85802~mv2_d_5312_2988_s_4_2.jpg/v1/crop/x_501,y_0,w_4310,h_2988/fill/w_299,h_207,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Wetland.jpg)
190 GOLDMINE ROAD
-
Conceptual stormwater management plan for Reconfiguration of Lot (ROL) application.
-
Design of a stormwater treatment wetland to meet necessary site pollutant removal efficiencies.
-
Inclusion of both stormwater quality and quantity treatment measures to ensured that increases in stormwater pollutants and peak flow are mitigated.
-
Conceptual sediment and erosion controls designed to minimise the discharge of sediment laden stormwater.
Stormwater Management
![Colgate.jpg](https://static.wixstatic.com/media/347a87_10108cdbb27b4f1ba6a86d435423a482~mv2.jpg/v1/crop/x_372,y_0,w_1548,h_971/fill/w_295,h_185,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Colgate.jpg)
COLGATE SITE
Ecological and Stormwater Management
-
Ecological Assessment to identify existing environmental values of the site, with a focus on koala habitat.
-
Development of a rehabilitation management plan for retained koala habitat and surrounding disturbed land.
-
Design of a precinct-wide stormwater management system to address stormwater quality and quantity.
-
Provision of specialist advice throughout court proceedings to inform ecological outcomes.
![Old coach road.JPG](https://static.wixstatic.com/media/347a87_dcce6b5bf0734a0eb7853a6ecdd8ac8e~mv2.jpg/v1/crop/x_0,y_151,w_413,h_286/fill/w_300,h_208,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Old%20coach%20road_JPG.jpg)
OLD COACH ROAD UPGRADE
-
Provided erosion and sediment control advice to the City of Gold Coast as part of a large road upgrade project.
-
Developed and documented erosion and sediment control plans for implementation on site.
-
Undertook staged audits to ensure control measures were implemented and maintained with CPESC certification.
Erosion and Sediment Control
![GOPR2043.JPG](https://static.wixstatic.com/media/347a87_d5bc79805edd4a49832b3415757a8caf~mv2.jpg/v1/crop/x_0,y_85,w_3000,h_2080/fill/w_300,h_208,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/GOPR2043_JPG.jpg)
MARINA MIRAGE
-
Under marine plant impact assessment as part of a marina upgrade proposal.
-
An underwater drone was used to assess pylons and benthic flora.
-
Shoreline assessment of marine values.
Marine Plant Assessment
![Gold Coast Airport.JPG](https://static.wixstatic.com/media/347a87_604b9b0b389f4533a1af76b36503ab49~mv2.jpg/v1/crop/x_0,y_160,w_454,h_315/fill/w_298,h_207,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Gold%20Coast%20Airport_JPG.jpg)
GOLD COAST AIRPORT PRECINCT
-
A 2D TUFLOW hydraulic model was used to assess existing flood behaviour.
-
Updated hydrology was undertaken to reflect AR&R rainfall.
-
Modelling was conducted to assess hydraulic structure upgrades.
Hydraulic Assessment
![Montego Hills.JPG](https://static.wixstatic.com/media/347a87_660cecb250b14676abcaa9ed609101a7~mv2.jpg/v1/crop/x_81,y_0,w_969,h_672/fill/w_298,h_207,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Montego%20Hills_JPG.jpg)
MONTEGO
-
A 157 lot rural residential development - 4,000 m2 lots.
-
Prepared Stormwater Management designs for 9 treatment basins in association with Mortons Urban Solutions.
-
Undertook hydraulic modelling of major drainage lines and conveyance structures.
-
Supervised bioretention construction.
Stormwater Management
![Eastlake Street.JPG](https://static.wixstatic.com/media/347a87_a763e679902844e78ad0c9beec8ea7d3~mv2.jpg/v1/crop/x_35,y_0,w_682,h_468/fill/w_300,h_206,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Eastlake%20Street_JPG.jpg)
EASTLAKE STREET - INDUSTRIAL
-
A 17 lot industrial subdivision over 18 ha.
-
Undertook an environmental assessment to identify site environmental values.
-
Prepared a rehabilitation plan for degraded locally significant wetland areas.
-
Documented a stormwater management plan which included two large bioretention systems for the treatment of stormwater runoff,
-
Prepared a 2D hydraulic model to predict flood behaviour across the site and analyse the degree of impact to flood levels and velocities.
Stormwater Management, Hydraulic Assessment, Ecological
![Commera2.JPG](https://static.wixstatic.com/media/347a87_ff70680ac1b148c9a291cb62c929c500.jpg/v1/crop/x_42,y_0,w_603,h_418/fill/w_300,h_208,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Commera2_JPG.jpg)
RESIDENTIAL SUBDIVISION, COOMERA
-
Stormwater Management for 288 lot freehold residential subdivision.
-
Design and documentation of two (2) large stormwater treatment measures.
-
Ensured that increases in stormwater pollutants and peak flow are mitigated prior to discharge to downstream properties.